You are here: Home
All other trails are open.
Bootjack Trail is now re-opened with a reroute through the slide area just above Muir Woods!
Slide repair work was accomplished by the Tamalpais Conservation Club (TCC) sponsored trail steward, a Conservation Corp North Bay (CCNB) trail crew, Chico State University student volunteers, and State Park staff. The storm caused slide damaged the trail after extensive work had been done by California State Park state-wide trail crew leads and trail crews from the California Conservation Corps (CCC). Extensive tread work, rock armored crossings, wood and rock stair repair, and bridge replacements can be appreciated along the trail from Muir Woods to the Bootjack parking lot.
The trail work compliments the methods and materials utilized by early Mount Tamalpais conservation group efforts and Civilian Conservation Corps work from the 1930's.